We continue to enhance the landscape at our Marion facility. Over 5000 square feet of asphalt have been removed and replaced with a dress gravel that will reduce stormwater runoff and allow water to be retained in the soil. Landscape fabric was used to control weed growth, thus eliminating the need for harsh herbicides. Additional green space is being created with grass and trees adjacent to the north driveway. These enhancements not only improve the appearance of our facility, but they are eco-friendly with improved runoff control and additional green space. This upgrade is in addition to the recent green space created.